Rasuwagadhi Hydroelectric Project

Rasuwagadhi Hydroelectric Project (RGHEP) is a 111 MW Run of River hydroelectric scheme located in Rasuwa District, approximately 150 km north of Kathmandu.

The project consists of a diversion weir, underground desander chambers, a 4 km long headrace tunnel, an underground powerhouse complex, 3 vertical axis francis turbines and 132kV double circuit transmission line

View

Budhi Gandaki Hydroelectric Project Development Committee

The Budhi Gandaki Hydroelectric Project is a storage type project with installed capacity of 1200 MW (6 units of each 200 MW) with operating rated head of 200m

View Project

WE ADD VALUE TO OUR CLIENTS

GCE Group is a investment, trading and agency house having it’s interests in energy. We serve various principals and assist them in all the local requirements and advice. Our focus is to be one of the best companies in Nepal in the sectors we serve and add value and competitiveness to our clients and principals.

Read More

OUR EXPERTISE

Likhu IV is  53.6 MW run-of-river hydro electric project along Likhu River and is located around 220 KM from Kathmandu, capital of Nepal. The project has favorable hydrology and is easily accessible. The project is being developed by Green Ventures Pvt. Ltd. (which is a joint venture between Bhilwara Energy Limited and Triveni Group of Nepal).

Same as Rasuwagadhi, Jade Infra has been working for the installation, testing and commissioning of Electro-mechanical Equipment of the powerhouse including proper tools/equipment, consumable and resources (workers, technical experts, etc), construction of site facilities, camp, closed storage, open storage with theirs proper operation.

 

Hydropower

Transmission Line and Substation

Hydro Mechanical

Solar Power

Electro Mechanical

Bridge and Roads