International Representation

Likhu-4 Hydropower Project

Likhu IV is  53.6 MW run-of-river hydro electric project along Likhu River and is located around 220 KM from Kathmandu, capital of Nepal. The project has favorable hydrology and is easily accessible. The project is being developed by Green Ventures Pvt. Ltd. (which is a joint venture between Bhilwara Energy Limited and Triveni Group of Nepal).

With the assistance of GCE Group, Turnkey contract for Supply Delivery, Erection, Installation & Commissioning of Electro-mechanical equipment for Likhu-4 Hydro Power Project had been awarded to VOITH Hydro Pvt. Ltd.