Likhu IV is 52.4 MW run-of-river hydro electric project along Likhu River and is located around 220 KM from Kathmandu, capital of Nepal. The project has favorable hydrology and is easily accessible. The project is being developed by Green Ventures Pvt. Ltd which is a joint venture between Bhilwara Energy Limited and Triveni Group of Nepal.
Jade Infra has completed the installation, testing and commissioning of Electro-mechanical Equipment of the powerhouse including proper tools/equipment, consumable and resources (workers, technical experts, etc), construction of site facilities, camp, closed storage, open storage with theirs proper operation.