Rasuwagadhi Hydroelectric Project (RGHEP) is a 111 MW Run of River hydroelectric scheme located in Rasuwa District, approximately 150 km north of Kathmandu.
The project consists of a diversion weir, underground desander chambers, a 4 km long headrace tunnel, an underground powerhouse complex, 3 vertical axis francis turbines and 132kV double circuit transmission line.
Jade Infra has been working for the installation, testing and commissioning of Electro-mechanical Equipment of the powerhouse including proper tools/equipment, consumable and resources (workers, technical experts, etc). Construction of site facilities, camp, closed storage, open storage with their operation.