About Us

Pioneering Excellence and Innovation Since 1960

About US

We Add Value and Competitiveness

Our business commenced during the tenure of Prime Minister Chandra Shamsher Rana (1901–1929). We were involved in constructing Hiti Chowk, supplying food grains at fair prices, providing various commodities to Pashupatinath Temple, and catering to the needs of the Army. Following the end of the Rana rule, our forefathers ventured into various areas of business sectors. One notable initiative was the introduction of High-Density Polyethylene (HDPE) pipes for drinking water supply, replacing the traditional G.I. pipes. During the 1960s, we served as suppliers for materials to significant hydropower projects such as Trishuli, Devighat, Khopasi, and Sunkoshi. We are a business house with investments, trading, agency, and a complete infrastructure solution from Engineering, Construction to Operation and Maintenance. Our focus is to be one of the best companies in Nepal in the sectors we serve and add value and competitiveness to our clients and principals.

Our Vision

In today’s challenging global marketplace, companies require a committed outstanding professional provider who truly understands their business.

Our Mission

A professional firm whose aim is to turn knowledge into value for the benefit of its clients, its people and its communities.

Our Values

We believe that we can add value for our clients if we truly understand their industry. Companies have relied on GCE for sound and valuable business advice.

EVOLUTION OVER THE YEAR S

GCE Group's
Historical Timeline

HDPE

Introduction of High-Density Polyethylene (HDPE) pipes for drinking water supply, replacing the traditional G.I. pipes

The Initiation

Constructing Hiti Chowk, supplying food grains at fair prices, providing various commodities to Pashupatinath Temple, and catering to the needs of the Army.

ACSR Conductors and Energy Meters

We supplied various electrical goods, including ACSR Conductors and Energy Meters, as well as assorted hardware sourced from Inaba Denki Sagyo Co. Ltd, Japan, to the Department of Electricity and Nepal Electricity Association.

We procured 33kV lattice towers from Kamani Engineering Co., Bombay.

We procured 33kV lattice towers from Kamani Engineering Co., Bombay.

We procured 33kV lattice towers from Kamani Engineering Co., Bombay.

We procured 33kV lattice towers from Kamani Engineering Co., Bombay.

We procured 33kV lattice towers from Kamani Engineering Co., Bombay.

We procured 33kV lattice towers from Kamani Engineering Co., Bombay.

We procured 33kV lattice towers from Kamani Engineering Co., Bombay.

We procured 33kV lattice towers from Kamani Engineering Co., Bombay.

132kV Bharatpur-Pokhara Transmission Line

We actively participated in the construction of the 132kV Bharatpur-Pokhara Transmission Line, funded under the Asian Development Bank (ADB).

Rasuwagadhi Hydroelectric Project

The 111 MW Rasuwagadhi Hydroelectric Project (RGHEP) in Rasuwa District, 150 km north of Kathmandu, features a diversion weir, underground desander chambers, a 4 km headrace tunnel, and an underground powerhouse with three vertical-axis Francis turbines. Supported by GCE Group, the turnkey contract for electro-mechanical equipment supply, installation, and commissioning was awarded to VOITH Hydro Pvt. Ltd.

Likhu-4 Hydropower Project

The 52.4 MW Likhu IV Hydroelectric Project, located 220 km from Kathmandu on the Likhu River, is a run-of-river scheme with favorable hydrology and accessibility. Developed by Green Ventures Pvt. Ltd, a joint venture between Bhilwara Energy Limited and Nepal's Triveni Group, the project’s electro-mechanical equipment contract, supported by GCE Group, was awarded to VOITH Hydro Pvt. Ltd.

bridges

Kathmandu – Terai Fast Track Project

The Kathmandu-Terai/Madhesh Fast Track (KTFT) aims to enhance transport reliability, reducing travel time and costs between Kathmandu and border points. Designed to meet Asian Highway Standards, the project includes a twin-lane expressway, tunnels, and bridges. Supported by GCE Group, China State Construction secured the EPC contract for its full planning, design, and construction.

Siddhababa Tunnel Project

The 1.12-km twin-lane tunnel on Nepal's Siddhartha Highway connects key districts. Built under the EPC model by China State Construction, with GCE Group's support, the five-year project includes planning, design, and construction of the tunnel and related infrastructure.

1960
1969
1970
1970
1971
1972
1975
1980
2017
2018
2021
2021
Chairman Image

Message from Chairman

Our journey is guided by a dedication to understanding the unique needs of our clients. We believe that true success lies in forging strong partnerships, offering invaluable insights, and providing unwavering support. Companies have entrusted GCE for sound business advice, and we take pride in being a dependable ally in their ventures.

As we navigate the challenges of the global marketplace, GCE remains steadfast in its commitment to excellence, integrity, and client satisfaction. Together, let us chart a course towards shared success and a brighter future.

Brindaban Man Pradhanang
Chairman, GCE group

Get In Touch

Ready to explore opportunities, discuss partnerships, or inquire about services? Get in touch and let's embark on a journey of collaboration and success together.

Get in Touch
Copyright 2025. GCE Group. All Rights Reserved.