Mewa Khola Hydropower Project is a Run-of-River type hydropower project with generating capacity of 23.00 MW in Taplejung District. The design discharge of the proposed scheme is 3.15 m3/sec with gross head of 901.74 m. Union Mewa Hydro Ltd. (UMHL) is the developer of the project whereas the Laxmi Bank Limited is the lead bank of the consortium of banks/financial institutions to raise the required loan for the financing of the project.

HCEL has carried out due diligence study of the project on behalf of the financing bank. Major scope for this project is to review the project accessibility, hydrology & geology, project layout & project component parameters and review of the environmental and social aspect including the potential risk factors. Further, review of project cost estimate and annual energy estimate and preparation of due diligence report lies on the scope of work

 

Investment

Sailent features

SN Particular Salient Features
1 General
Installed capacity 23 MW
Client Union Mewa Hydro Ltd
Project Location Taplejung District
Type of Scheme Peaking Run-of-River (PRoR)
Gross Head 901.74 m
Design Discharge 3.15 m3/sec
Headrace Tunnel 3589.20 m length D Shaped, 2.2 m (W) x 2.5 m (H)
Penstock Pipe 1381.56 m length, 1.1 m dia
Powerhouse Surface, 2 units of horizontal axis Pelton Turbine