Erection and Installation Archives - GCE Group /project-type/erection-and-installation/ An Investment, Trading and Agency House Wed, 23 Feb 2022 06:48:46 +0000 en-US hourly 1 Solu Khola (Dudhkoshi) 86 MW /project/solu-khola-dudhkoshi-86-mw/ Tue, 22 Feb 2022 04:39:02 +0000 /?post_type=project&p=284 Solu Khola (Dudhkoshi) Hydroelectric Project (SKDKHEP) is an 86 MW Run Of River (RoR) type of project located at Solududhkunda Municipality & Thulung Dudh Koshi Gaupalika (Former Tingla, Kangel & Panchan VDCs) of Solukhumbu District, Sagarmatha Zone, Nepal. The project area is about 130 km (aerial) east of Kathmandu. Jade Infra is doing the installation,... Read more »

The post Solu Khola (Dudhkoshi) 86 MW appeared first on GCE Group.

]]>
Solu Khola (Dudhkoshi) Hydroelectric Project (SKDKHEP) is an 86 MW Run Of River (RoR) type of project located at Solududhkunda Municipality & Thulung Dudh Koshi Gaupalika (Former Tingla, Kangel & Panchan VDCs) of Solukhumbu District, Sagarmatha Zone, Nepal. The project area is about 130 km (aerial) east of Kathmandu.

Jade Infra is doing the installation, testing and commissioning of Electro-mechanical Equipment of the powerhouse including proper tools/equipment, consumable and resources (workers, technical experts, etc), construction of site facilities, camp and open and closed storage.

The post Solu Khola (Dudhkoshi) 86 MW appeared first on GCE Group.

]]>
Super Madi HEP (44 MW) /project/super-madi-hep-44-mw/ Tue, 20 Apr 2021 11:16:50 +0000 /?post_type=project&p=241 Jade Infra has been working for the supervision of Electromechanical works.

The post Super Madi HEP (44 MW) appeared first on GCE Group.

]]>
Jade Infra has been working for the supervision of Electromechanical works.

The post Super Madi HEP (44 MW) appeared first on GCE Group.

]]>
Likhu-4 Hydro Power Project (52.4 MW) /project/likhu-4/ Sun, 01 Sep 2019 18:21:32 +0000 //?post_type=project&p=166 Likhu IV is  52.4 MW run-of-river hydro electric project along Likhu River and is located around 220 KM from Kathmandu, capital of Nepal. The project has favorable hydrology and is easily accessible. The project is being developed by Green Ventures Pvt. Ltd which is a joint venture between Bhilwara Energy Limited and Triveni Group of... Read more »

The post Likhu-4 Hydro Power Project (52.4 MW) appeared first on GCE Group.

]]>
Likhu IV is  52.4 MW run-of-river hydro electric project along Likhu River and is located around 220 KM from Kathmandu, capital of Nepal. The project has favorable hydrology and is easily accessible. The project is being developed by Green Ventures Pvt. Ltd which is a joint venture between Bhilwara Energy Limited and Triveni Group of Nepal.

Jade Infra has completed the installation, testing and commissioning of Electro-mechanical Equipment of the powerhouse including proper tools/equipment, consumable and resources (workers, technical experts, etc), construction of site facilities, camp, closed storage, open storage with theirs proper operation.

 

The post Likhu-4 Hydro Power Project (52.4 MW) appeared first on GCE Group.

]]>
Rasuwagadhi Hydro Power Project (111MW) /project/rasuwagadhi-hydro-power-project/ Sun, 01 Sep 2019 18:05:03 +0000 //?post_type=project&p=161 Rasuwagadhi Hydroelectric Project (RGHEP) is a 111 MW Run of River hydroelectric scheme located in Rasuwa District, approximately 150 km north of Kathmandu. The project consists of a diversion weir, underground desander chambers, a 4 km long headrace tunnel, an underground powerhouse complex, 3 vertical axis francis turbines and 132kV double circuit transmission line. Jade... Read more »

The post Rasuwagadhi Hydro Power Project (111MW) appeared first on GCE Group.

]]>
Rasuwagadhi Hydroelectric Project (RGHEP) is a 111 MW Run of River hydroelectric scheme located in Rasuwa District, approximately 150 km north of Kathmandu.

The project consists of a diversion weir, underground desander chambers, a 4 km long headrace tunnel, an underground powerhouse complex, 3 vertical axis francis turbines and 132kV double circuit transmission line.

Jade Infra has been working for the installation, testing and commissioning of Electro-mechanical Equipment of the powerhouse including proper tools/equipment, consumable and resources (workers, technical experts, etc). Construction of site facilities, camp, closed storage, open storage with their operation.