Likhu 4 Hydro Electric Project (52.4 MW)

likhu-Recovered

Project Specifications

CAPACITY:
52.4 MW
CLIENT:
Voith Hydro Pvt Ltd
CATEGORY:
Hydropower
PROJECT TYPE:
Installation, Testing and Commissioning
STATUS:
Completed

Project Overview

Likhu IV isĀ  52.4 MW run-of-river hydro electric project along Likhu River and is located around 220 KM from Kathmandu, capital of Nepal. The project has favorable hydrology and is easily accessible. The project is being developed by Green Ventures Pvt. Ltd which is a joint venture between Bhilwara Energy Limited and Triveni Group of Nepal. Jade Infra has completed the installation, testing and commissioning of Electro-mechanical Equipment of the powerhouse including proper tools/equipment, consumable and resources (workers, technical experts, etc), construction of site facilities, camp, closed storage, open storage with theirs proper operation.

Get In Touch

Ready to explore opportunities, discuss partnerships, or inquire about services? Get in touch and let's embark on a journey of collaboration and success together.

Get in Touch
Copyright 2025. GCE Group. All Rights Reserved.