Rasuwagadhi Hydroelectric Project

Project Specifications

INSTALLED CAPACITY:
111 MW
TURBINE:
3×38.5MW Vertical Francis
GROSS HEAD:
167.90 m

Project Overview

Rasuwagadhi Hydroelectric Project (RGHEP) is a 111 MW Run of River hydroelectric scheme located in Rasuwa District, approximately 150 km north of Kathmandu. The project consists of a diversion weir, underground desander chambers, a 4 km long headrace tunnel, an underground powerhouse complex, 3 vertical axis francis turbines and 132kV double circuit transmission line. With the assistance of GCE Group, Turnkey contract for Supply Delivery, Erection, Installation & Commissioning of Electro-mechanical equipment for Rasuwagadhi Hydro Power Project had been awarded to VOITH Hydro Pvt. Ltd.