Rasuwagadhi Hydroelectric Project

Rasuwagadhi Hydroelectric Project (RGHEP) is a 111 MW Run of River hydroelectric scheme located in Rasuwa District, approximately 150 km north of Kathmandu.

View Project

Budhi Gandaki Hydroelectric Project Development Committee

The Budhi Gandaki Hydroelectric Project is a storage type project with installed capacity of 1200 MW (6 units of each 200 MW) with operating rated head of 200m

View Project

WE ADD VALUE TO OUR CLIENTS

GCE Group is a investment, trading and agency house having it’s interests in energy. We serve various principals and assist them in all the local requirements and advice. Our focus is to be one of the best companies in Nepal in the sectors we serve and add value and competitiveness to our clients and principals.

Read More

OUR EXPERTISE

This project is located in Trishuli River of Rasuwa district with installed capacity of 216 MW with annual energy generation 1556 GWh in average year. The project consists of diversion weir with intake facility to withdraw design discharge of 76m3/s. There is an underground desilting basin with suitable silt exclusion tunnel. Clean water through the desilting basin is conveyed through headrace tunnel of length 9.7 km and 6.5 m diameter .There is provision of surge shaft at the end of headrace tunnel and water is conveyed to drop shaft of 6.5m diameter and length of 292 m which connects to penstock of length 110 m.  The water through the penstock is trifurcated and fed to the Francis turbine of 72 MW rated capacity. The turbine water is again discharged to Trishuli river through tailrace tunnel of 6.5m diameter and 240 m long. There is open switch-yard in front the portal of access tunnel with required facility to transfer voltage to 220kV. The power is evacuated from switchyard with transmission line of 220kV capacity and 10 km length terminating at Trishuli-3B hub, grid connection point allotted by NEA.

Hydropower

Transmission Line and Substation

Hydro Mechanical

Solar Power

Electro Mechanical

Bridge and Roads