Mewa Khola Hydropower Project

Mewa Khola Hydropower Project with Installed Capacity 23MW is located in Taplejung District. Powerhouse location is proposed at the left bank of Mewa khola 1500 m. u/s of Mewa Khola & Palung Khola confluence. The Tributaries of Mewa Khola at Intake is Mewa Khola and Phedi Khola. The design discharge is 3.16 m3/s and Gross Head is 893m. The power is evacuated through 132kv Trasnmission Line to Paplung Substation 4 km from Powerhouse. The Project will generate 137.797 GWh energy Anually.