International Representation

Rasuwagadhi Hydroelectric Project

INSTALLED CAPACITY

111 MW

TURBINE

3×38.5MW Vertical Francis

GROSS HEAD

167.90 m

Rasuwagadhi Hydroelectric Project (RGHEP) is a 111 MW Run of River hydroelectric scheme located in Rasuwa District, approximately 150 km north of Kathmandu.

The project consists of a diversion weir, underground desander chambers, a 4 km long headrace tunnel, an underground powerhouse complex, 3 vertical axis francis turbines and 132kV double circuit transmission line.

With the assistance of GCE Group, Turnkey contract for Supply Delivery, Erection, Installation & Commissioning of Electro-mechanical equipment for Rasuwagadhi Hydro Power Project had been awarded to VOITH Hydro Pvt. Ltd.