Nupche Likhu Hydropower Project

INSTALLED CAPACITY

57.5 MW

TURBINE

3 x 19.16 MW Pelton

GROSS HEAD

1002 m

The source of water for Nupche Likhu hydropower project is originated from snow fed rivers starting from the High Mountain/Hilly areas.

The proposed Nupche Likhu Hydropower Project is located in Gumdel VDC (Currenty Umakunda Rural Municipality) of Ramechhap District, Nepal. The proposed intake of the Nupche Likhu Hydropower Project is located north of Lahaksewar village in left bank of Nupche Khola at an elevation of 3330 m above msl.

With the assistance of GCE Group, Turnkey contract for Supply Delivery, Erection, Installation & Commissioning of Electro-mechanical equipment for Nupche Likhu Hydro Power Project had been awarded to VOITH Hydro Pvt. Ltd.